Archive for June, 2010
I am looking for quotations one the following concrete project. Time frame is completion in 8 weeks. Scope of project is as follows: Demolish and Remove existing 42′ wide by 48 foot sidewalk shown in the top 3 pictures. Replace with new sidewalk, same size. Remove all debris Replace or Repair existing 8′ x 4′ [...]




